2038 Products
4.95.0903.000<span style="font-size:11.0pt;font-family: "Calibri",sans-serif;mso-fareast-font-family:Calibri;mso-fareast-theme-font: minor-latin;color:#1F497D;mso-ansi-language:EN-US;mso-fareast-language:EN-CA; mso-bidi-language:AR-SA" >ASSEMBLED 32 FT TITAN T-900 SELF SUPPORT C/W STUB LEGS</span><!--[if gte mso 9]> <![endif]--><!--[if gte mso 9]> <![endif]--><!--[if gte mso 10]> <style> /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Times New Roman",serif;} </style> <![endif]-->
As Built DrawingsField Documentation That Must Be Provided: - Detailed Redline Drawings - Construction Photos of Foundations & Tower CSA-S37-18 Annex D Recommends Completing a Sub-Grade Inspection of the Foundation and Post-Installation Inspection of the Tower. These Should Also be Provided. Optional Documentation: - Concrete Test Reports - Post-Construction Site Inspection Report - Deficiency Correction Report Note: As-Built drawings are not P.Eng sealed