Field Documentation That Must Be Provided: - Detailed Redline Drawings - Construction Photos of Foundations & Tower CSA-S37-18 Annex D Recommends Completing a Sub-Grade Inspection of the Foundation and Post-Installation Inspection of the Tower. These Should Also be Provided. Optional Documentation: - Concrete Test Reports - Post-Construction Site Inspection Report - Deficiency Correction Report Note: As-Built drawings are not P.Eng sealed
- Manufacturer: Trylon